Cogeneration Power Plant-Elecrticity Power Plant - Product on equipupstore.com
HOME  >>  GAS TURBINE POWER PLANT  >>  POWER PLANTS  >>  Electricity Generating Plant     [ITEM IN AUCTION]

Cogeneration Power Plant

Product ID [EQUIP280]
Place a bid for this item [BID ID : 20160122280]

Time Left:
Current Bid 1200000 USD

Your bid: USD

(minimum: 1200000 USD)


By clicking the button below, you commit to pay the full amount thus buying the item from the seller if you are the winning bidder



Selling price does not include shipping and Tax. Contact seller for shipping arrangements
Selling Price:USD $14,000,000.00
Quantity:    1 Avaiable
Shipping and Handling Cost estimates 
Zip/Postal Code
Country
Shipping Type
 
Total Order Amount  :USD $

Min.Order Quantity:1 Units
Supply Ability:Now Quarterly
Port:USA
Place of Orgin:United States

Cogeneration 1.2MW Power Plant

We have available for immediate shipment the following:

One near new cogeneration system with modular design that has never been run in production.This system is a 1.2 Megawatt Power Plant
power plant and can burn bark, sawdust, agricultural wastes such as peanut shells, rice hulls, straw, animal residue, wet wood, etc. This system will convert such waste products into useable thermal and electrical energy. This solid waste stream can be converted into particle form by the use of a commercial shredder, conveyed to a silo for storage, and then fed automatically in the BEC combustion zone where a supply of steam is generated through a heat exchanger. Steam is transferred to the Elliott turbine that turns the Kato generator.

This system comes complete with generator control center, boiler control center, combustion control center, control room switchboard, turbine oil system, dust delivery control system, switchgear and PLC controls.

This plant was new in 2005 when installed and has never been run. The turbine gearbox and generator were OEM rebuilt. The company purchased this system with a guarantee the burner could meet NOX standards.
After installation, the burner could not efficiently burn medium density fiberboard with high formaldehyde content Consequently, the burner could not meet those NOX standards that are the most stringent in the state of California BEC’s burners are used throughout the United States and meet or exceed NOX control standards.

This cogen system can be professionally dismantled, all equipment tagged for reinstallation and shipped to your facility, reassembled, and connected to your present electrical grid system. It would take approximately 10 weeks to dismantle the plant and 10 flatbed trucks to ship the equipment to your plant site, and approximately 16 weeks to reassemble. This plant would include everything needed except fuel processing (grinding), storage and a transformer to supply power to your facility.

1.2/dusty
  
Model Number: 1.2 Megga Watt
Brand Name: CHALLENGER BURNER
Type of Product: Power Plant
Product Weight: 0 lbs.
Automatic Grade: Like New Never Fully Powered
Applications: EXCELLENT CONDITION
Year of Manufacture: 2005
Condition: EXCELLENT CONDITION
Certification: EXCELLENT CONDITION
  
Supply Ability: Quarterly
Delivery Time: 3-4 Weeks Weeks
Packaging Details: Bagging
Product Size
Weight
Width
Length
Height

0 lbs
0 in
0 in
0 in
     No Video Provided
     No Brochure Provided
Name:
Email:
Your Rating
Head Line for review
Your Comment
 

 Rigo Salinas

Already have Equip Up Store account?, Sign In
OR
Business Seller Plan    5th Year

Equip Up Store, LLC
United States         |       Contact details

Basic Facts about Seller's Company:

Business Established: 2014 , 6 Years

Seller's Performance on equipupstore.com:

Response Rate: 100%

Quality: 100% Guaranteed.

Delivery: 100% On-time delivery .

Payment: Seller is Paid when item is delivered..